USB C to Type C Cable 3A 60W Fast Charger Braided Long Lead 0.25M 1M 2M 3M

Category

Cables & Adapters

Store

eBay

Brand

My Fone Store

Cable Length: 1.2M (3.9 ft ), 2M (6.5 ft), 3M (9.8ft). Material : Braided Nylon & Aluminium. With its four color options and four length options, as well as its high-quality materials, this cable is a must-have for anyone who wants a dependable and fashionable charging and data transfer solution.

4.99 GBP